Infrastructure
2015 – El Sherouk Contracting
(6th of October Hospital - 2 Extra Floors Project)
Development of Design, fabrication & installation drawings & construction supervision of extension of 2 extra floors of 10,000 sqm per floor, above 4 floors of an existing and operating hospital building.​
__________________________________________________________________________________________________________________________
2015 - Roots Steel International (RSI)
(King Abdallah Foundation Project)
Connection Design & development of 3D model and fabrication/erection drawings, along with erection method statement for partitions doors supports (of Eighteen meter height) suspended from existing steel trusses and Platforms.
__________________________________________________________________________________________________________________________
2015 – M Group Matrix Design Co.
(Army Convention Center Project)
Design & fabrication drawings of GRP steel supporting system, attached to an existing concrete building, creating convention center façade.​
__________________________________________________________________________________________________________________________
2016 - Roots Steel International (RSI)
(Jeddah Corniche – Nawras Pedestrian Bridge Project)
Design and fabrication drawings for pedestrian bridge coping with tight architectural constraints.​​
__________________________________________________________________________________________________________________________
2016 – Rowad Modern Engineering (RME)
(Al Mostasmreen Substation Project)
Design of 10 types steel towers, supporting electrical equipment.​​
__________________________________________________________________________________________________________________________
2017 – ElEtribi for Manufacturing & Assembling Machinery Company
(Suez Canal Tunnels Project)
Design of movable steel platforms for tunnel boring equipment.​​
__________________________________________________________________________________________________________________________
2017 – Archirodon Construction (Overseas) Co. S.A.
(MIDTAP - New Mooring Dolphin In El Dekheila)
Design of Steel off-shore Walkway bridge spanning 30 m length connecting mooring dolphins​​.
__________________________________________________________________________________________________________________________
2017 – AECC- Petroleum Marine Service (PMS).
(Zohr Field Development Project Optimized Ramp-Up Phase)
Design of cofferdam end gate truss 40 m span, in order to excavate a pre-trench section, allowing Zohr pipelines to approach the shore. ​​
__________________________________________________________________________________________________________________________
2017 – Apex Power- TBEA
(Cairo West & Assiut Power Plants – Rails and inserted plates)
Development of Design calculations, fabrication & installation drawings for rails of GSU transformers.​​
__________________________________________________________________________________________________________________________
2017 – Apex Power- TBEA
(Zahraa El-Maadi Power Plant – Air Bus Bare Conductor Steel Supports)
Development of Design calculations, fabrication & installation drawings for air bus bare conductor steel supports.
__________________________________________________________________________________________________________________________
2018 – KEPCO
(Cairo West Plant – Chimney Steel Decks and Platform)
Development of Design calculations & Design Drawings for top chimney platform, 2 internal decks and outer marina.​​
__________________________________________________________________________________________________________________________
2018 – GRAND - VEOLIA
(Cairo West & Assiut Power Plants – Water Treatment Steel Sheds)
Development of Design calculations, fabrication & installation drawings of 3 buildings in each plant (CPP Chemical Area, Filter Press & WT Chemical Area)​​
__________________________________________________________________________________________________________________________
2018 – Rowad Modern Engineering (RME)
(RTG Reefer Platform & Workshop - Port of Algiers Container Terminal)
Development of Design calculations & Design Drawings for 6 numbers reefer platforms and one workshop building including crane design and multi story admin. Building.​​
__________________________________________________________________________________________________________________________
2018 – Arab Steel Fabrication Co. (ASF) | (El Sewedy Industries)
(Steel Bridges & Arcade-Ministries Buildings-New Capital-Governmental District)
Development of Design calculations & Design Drawings for 3 bridges and Arcade on ground floor for ministries building in new capital.
__________________________________________________________________________________________________________________________
2019 – Gharably Integrated Eng. Co. (GIECO)
(Ministries Buildings-New Capital-Governmental District)
Development of Design calculations & Design Drawings of steel supporting systems for 58 elevators for ministries building in new capital.
__________________________________________________________________________________________________________________________
2019 — OverSeas for International Lifts
Dorrat Al Kirz Compound – 5th Settlement
Development of Design calculations & Design Drawings of steel supporting systems for 54 elevators.
_________________________________________________________________________________________________________________________
2019 — Archirodon Construction (Overseas)
Sidi Krir Power Plant – Discharge Structure Cover
Development of Design Drawings, Design calculations & review of fabrication drawings.
_________________________________________________________________________________________________________________________
2020 — Arab Steel Fabrication Co. (ASF) | (El Sewedy Industries).
Technip-Midor Refinery Expansion-Alexandria
Connections design & Development of Design calculations for 8 pipe racks.
_________________________________________________________________________________________________________________________
2020 — Arab Steel Fabrication Co. (ASF) | (El Sewedy Industries).
New Capital-El Sewedy Knowledge Hub-Labs Building
Development of Design Drawings, Design calculations, Fabrication & Erection drawings.
_________________________________________________________________________________________________________________________
2020 — KEPCO
Attaka Power Plant - Chimney Steel Decks and Platform
Development of Design calculations & Design Drawings for top chimney platform, 2 internal decks.
_________________________________________________________________________________________________________________________
2021 — Masarat Misr – El Sewedy T&D
Intelligent Transportation System (Shobra Banha Road)
Providing structural consultancy services for all steel structures and civil works (Steel Gantries & Steel Poles).
_________________________________________________________________________________________________________________________
2021 — Rowad Modern Engineering (RME)
Main covered hall - Misr International Olympic Games City - Administrative Capital
Providing project management consultancy services, for the construction of Hall façade and 18,000 m2 space frame roof.
_________________________________________________________________________________________________________________________
2022 — Folaz Building Systems — Rowad Modern Engineering (RME)
Main covered hall - Misr International Olympic Games City – VVIP Entrance
Development of Design calculations, Design drawings, Fabrication drawings & Erection Drawings.